|
SYSTEM DESCRIPTION
|
|
Water is produced by three wells located within the development, with a primary well producing most of the supply. Water is pumped up to an arsenic treatment plant and then stored in a concrete reservoir before being delivered by gravity flow to the distribution system.
|
current updates
|
|
The system is currently operating as normal.
|
water testing
|
|
Alpine Environmental collects one sample for coliform bacteria each month. This sample is rotated between three collection sites within the system. Monthly arsenic tests are also collected to ensure that the treatment plant is removing arsenic properly. An annual test for nitrate is collected from the source. Every three years or more, tests for metals and minerals, petroleum products, and radioactive particles are collected. Results of the most recent testing are summarized in the Consumer Confidence Report.
|
consumer confidence report
|
|
|
system contacts
|
|
Certified Operator
Douglas Hale Alpine Environmental 4 Norway Pine Dr. Tonasket, WA 98855 509-322-0581 |
Association President
Dewey Bray 509-230-8104 Association Billing vacant |
|
Send us your email address if you would like to receive notifications about significant events regarding this water system. This service is only available to customers of the selected water system.
|